CRL concrete repairs and protective coatings
Ian Callaway
04/11/24
CRL have recently been on site at Slough ATE carrying out concrete repairs, Margel capsule installation, window repairs and both Crittal window and concrete protective coatings to three BT buildings within the main BT compound. Works have been carried out as a Principal contractor under Nec4 but through CBRE as framework delivery contractor.

Four MEWPS of various sizes were required for high and often challenging access and along with this CRL had to gain access to several areas that were deemed strictly off limits to visitors and the public.

Project Duration - 9 weeks
Project cost - 250k
Contracts Manager - Roger Southwell
Senior contract Supervisor - Rob Nadjack
Materials - SIKA Specification- 1010/ 4012/ Margel VPI 580s coatings - SIKA 552 / 675.